Jump to content
IGNORED

RRRARRRHRHRHRH


Recommended Posts

:trashbear::facepalm::nelson::diablo:

 

Apparently theres a recession on, but this week has been stupidly busy, to the point of counter-productivity 80% of the day because im trying to handle too many projects at once.

 

You just get started on something, then the phone rings / email comes through / customer turns up and its all pear-shaped again.... f*&king unorganised builders / architects changing drawings and measurements all the time.

 

RARRRRRRRRRRR

 

Actually dont remember ever having to deal with so many jobs at once, 3 of them I am handling are quite high value too.

 

But hey, its the weekend... :cisfor:

 

...well nearly... im working tomorrow morning too...

 

(also grandad's in hospital and had an operation, but he is on the mend, so thats one less thing to worry about)

 

Anyone else had a sh1te day and want to vent some anger???

 

*feels better, nearly home time*

Link to comment
https://forum.watmm.com/topic/63549-rrrarrrhrhrhrh/
Share on other sites

  On 2/4/2011 at 6:12 PM, feltcher said:

f*&king unorganised builders / architects changing drawings and measurements all the time.

 

i feel your pain on this.

 

what'd you do?

jjbms1.jpg

 

  Reveal hidden contents

 

Link to comment
https://forum.watmm.com/topic/63549-rrrarrrhrhrhrh/#findComment-1509861
Share on other sites

Guest ruiagnelo
  On 2/4/2011 at 6:25 PM, keltoi said:
  On 2/4/2011 at 6:12 PM, feltcher said:

f*&king unorganised builders / architects changing drawings and measurements all the time.

 

i feel your pain on this.

 

what'd you do?

 

yeah, what is your work about?

something related to architecture, as i can see...

Edited by ruiagnelo
Link to comment
https://forum.watmm.com/topic/63549-rrrarrrhrhrhrh/#findComment-1509872
Share on other sites

Guest ezkerraldean

lol i kept changing the angles of drill holes at the last minute, really pissed off the drillers, especially since i had to get someone else to tell them because i don't speak their strange bastardised version of French lol

 

all the work is finished now though. so now i'm getting paid to sit on my arse until i can fly out of here next week lol

Link to comment
https://forum.watmm.com/topic/63549-rrrarrrhrhrhrh/#findComment-1509883
Share on other sites

we are steel fabricators, i do a lot of the project management, pricing, purchasing and plenty of the dogsbody workshop stuff too... Anyways enough of work for now im drinking wine and watching the rugby!

Link to comment
https://forum.watmm.com/topic/63549-rrrarrrhrhrhrh/#findComment-1510047
Share on other sites

Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   1 Member

×
×